CRP 3230 - Pine Bluff Bridge No. 2609 Scour Repair

This work provides for the improvement of the Pine Bluff Road Bridge No. 2609 located in Section 18 in Township 26 N. Range 42 E.W.M. by stabilizing the Coulee Creek slopes below the bridge by, this will be accomplished by; installing short cast-in-place concrete walls anchored to bedrock at the bases of the slopes, placing shotcrete on the slopes with soil/rock anchors, anchoring habitat boulders to bedrock at the base of the slopes and placing rip rap along the channel edges and walls. Included are; rock excavation, concrete Class 4000., steel reinforcement, epoxy-coated steel reinforcement shotcrete, rock anchors, streambed sediment and other work.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover 473.6 KB
02 - Notice to Contractors-Bidders 1.0 MB
03 - Table of Contents 343.8 KB
04 - Contract Informational Copy 339.9 KB
05 - Contract Bond Informational Copy 276.4 KB
06 - Special Provisions 9.5 MB
07 - Appendix A - Required Contract Provisions Federal-Aid Construction Contracts 6.6 MB
08 - Appendix B - Wage Rates 30.9 MB
09 - Appendix C - WA State Dept of Labor and Industries Policy Statement 1.5 MB
10 - Appendix D - Geotechnical Information 958.4 KB
11 - Appendix E - Environmental Permits 5.1 MB
12 - Appendix F - Informational Copies of Documents for Bid Submittal 2.5 MB
13 - Appendix G - Documents for Bid Submittal 2.3 MB
14 - Appendix H - Plan Sheets 14.1 MB