CRP 3244A - Geiger Blvd. - Soda Rd. to Grove Rd.

This contract provides for the improvement of Geiger Blvd. from Soda Road to Grove Road in Sections 4 & 5 in Township 24 N, Range 42 E., and in Section 33 in Township 25 N, Range 42 E.W.M. by clearing and grubbing, removing concrete pavement, common borrow, embankment compaction, installing drywells, crushed surfacing top course, gravel borrow, HMA, topsoil, seeding, fertilizing and mulching, water pollution control, medium compost, cement concrete curb, cement concrete sidewalk, signing, pavement markings, illumination system, water main, sewer main, communications conduit and cable vault, temporary traffic control, and other work.

Status

Accepting Bids

Prebid Date7/7/20 1:00 pm

Bid Date7/15/20 11:00 am

Company & Contacts

Spokane County Engineering

Tim Schwab   (509) 477-3600

Location

Spokane County, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

A pre-bid conference for all interested bidders will be held on Tuesday, July 7, 2020 at 1:00 P.M. in the Public Works Building, 1026 West Broadway, Spokane, Washington. All bidders or their representatives are asked to attend. Please reference the Notice to Contractors for complete details.