CRP No. 3239 Frideger Road Bridge No. 4902/CRP No. 3245 Frideger Road

County Road Project No. 3239: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., followed by the removal of the existing bridge and the construction of a new structure over Little Spokane River. The new concrete bridge is a single span framed with precast-prestressed girders and is supported by steel pile at each end. Included are; bridge removal, structure excavation, structure surveying, steel piling, cone. CL 4000 for bridge, steel reinf. bar for bridge, superstructure, dust control on detour, beam guardrail, concrete barrier and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification. County Road Project No. 3245: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., by removal of the existing roadway and widening with the construction of the new roadway. Project limits extend along Frideger Road with CRP-3245, adjoining CRP-3239 (bridge) at each end, starting 350 feet north of the bridge and ending 1/2 mile south of the bridge. Included are; clearing and grubbing, roadway excavation, embankment compaction, gravel borrow, beam guardrail, HMA, CSBC, dust control maintenance on the detour, and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification.
  Addendum #1 (click to expand/collapse)
Name Size
Addendum 1 C3239 1.5 MB
  Addendum #2 (click to expand/collapse)
Name Size
addendum2 1.1 MB