CRP No. 3238 Separated Spokane River Centennial Trail at Carlson Road
This contract provides for the improvement of the Centennial Trail located in Sections 6 and 7 in Township 26 N, Range 42 E.,W.M. by clearing and grubbing, roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Addendum #1
(click to expand/collapse)

Name | Size | |||
Addendum 1 C3238- Centennial Trail | 452.1 KB |
Addendum #2
(click to expand/collapse)

Name | Size | |||
Addendum 2 C3238 Centennial | 3.0 MB |
Pre-Bid Meeting Agenda
(click to expand/collapse)

Name | Size | |||
C3238 Centennial Trail Pre-Bid Meeting Agenda | 146.4 KB |