CRP No. 3238 Separated Spokane River Centennial Trail at Carlson Road

This contract provides for the improvement of the Centennial Trail located in Sections 6 and 7 in Township 26 N, Range 42 E.,W.M. by clearing and grubbing, roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
  Plans (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover Sheet 1.2 MB
02 - Summary of Quantities - Construction Notes 1.4 MB
03 - Typical Sections 1.0 MB
04 - Typical Sections 945.0 KB
05 - Revegetation Plan 1.1 MB
06 - TESC Plan 1.0 MB
07 - TESC Plan 1.0 MB
08 - TESC Plan 1.2 MB
09 - TESC Plan 796.3 KB
10 - Plan & Profile 1.5 MB
11 - Plan & Profile 1.0 MB
12 - Plan & Profile 1.1 MB
13 - Plan & Profile 926.1 KB
14 - Plan & Profile 1.2 MB
15 - Plan & Profile 953.9 KB
16 - Plan & Profile 961.7 KB
17 - Plan & Profile 841.1 KB
18 - Plan & Profile 975.7 KB
19 - Signing and Striping 1.2 MB
20 - Signing and Striping 1.2 MB
21 - Traffic Control 596.4 KB
22 - Traffic Control Plan 1.0 MB
23 - Traffic Control Plan 766.9 KB