CRP No. 3238 Separated Spokane River Centennial Trail at Carlson Road

This contract provides for the improvement of the Centennial Trail located in Sections 6 and 7 in Township 26 N, Range 42 E.,W.M. by clearing and grubbing, roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
  Specifications (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover 533.9 KB
02 - Notice to Contractors-Bidders 1.0 MB
03 - Table of Contents 658.8 KB
04 - Information Only Contract 345.5 KB
05 - Information Only Contract Bond 299.2 KB
06 - Special Provisions 29.5 MB
07 - Appendix A - Required Contract Provisions Federal-Aid Construction Contracts 6.5 MB
08 - Appendix B - Federal Wage Rates 6.2 MB
09 - Appendix C - State Wage Rates 9.4 MB
10 - Appendix D - WA State Dept of Labor and Industries Policy Statement 4.7 MB
11 - Appendix E - Copy of Right of Entry Permit from WA State Parks 5.0 MB
12 - Informational Copies of Documents for Bid Submittal 2.3 MB
13 - Documents for Bid Submittal 2.0 MB