CRP No. 2924 - Bigelow Gulch - Phase 3

This contract provides for the improvement of Bigelow Gulch Road in Section 25, Township 26 N., Range 43 E. & in Section 30, Township 26 N., Range 44 E., W.M. by clearing and grubbing, roadway excavation, embankment compaction, plain steel culvert pipe, catch basins, storm sewer pipe, crushed surfacing top course, cement treated base spreading, mixing, processing and shaping, hot mix asphalt, topsoil, seeding, fertilizing and mulching, erosion control, guardrail, pavement marking, signing, illumination system, traffic control, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
  Plans (11x17) (click to expand/collapse)
Order this section, price will be calculated by SQFT
This is available for download & digital takeoff to registered users Log in now
Order files below, price will be calculated by SQFT
Name Size
01 - Cover Sheet 1.5 MB
02 - Summary of Quantities 1.3 MB
03 - Typical Roadway Sections 945.9 KB
04 - Details & Roadway Side Slope Table 1.8 MB
05 - Construction Phasing - Phase 1 1.2 MB
06 - Construction Phasing - Phases 2, 3 & 4 1.1 MB
07 - Site Prep - Utility Plan 1.9 MB
08 - Site Prep - Utility Plan 1.7 MB
09 - Plan & Profile 2.4 MB
10 - Plan & Profile 2.5 MB
11 - Plan & Profile 2.2 MB
12 - Plan & Profile 2.2 MB
13 - Side Road Connections - Plan & Profile 747.0 KB
14 - Side Road Connections - Plan & Profile 1.2 MB
15 - Drive Connections - Plan & Profile 1.6 MB
16 - Drive Connections - Plan & Profile 1.5 MB
17 - Drive Connections - Plan & Profile 1.3 MB
18 - Drive Connections - Plan & Profile 1.6 MB
19 - Drive Connections - Plan & Profile 1.5 MB
20 - Drive Connections - Plan & Profile 1.3 MB
21 - Drive Connections - Plan & Profile 1.4 MB
22 - Drive Connections - Plan & Profile 1.5 MB
23 - Drive Connections - Plan & Profile 1.7 MB
24 - Drive Connections - Plan & Profile 1.4 MB
25 - Drive Connections - Plan & Profile 844.7 KB
26 - Connection to Ex. Bigelow Gulch Rd 1.5 MB
27 - Driveway Connections to Connection Alignment 'F' 919.6 KB
28 - Temporary Connection to Theirman Rd & Temp. Bigelow Gulch Rd 1.4 MB
29 - Drainage Swale 1 Plan with Cross Section & Weir Details 1.0 MB
30 - Drainage Swale 3 Plan 1.2 MB
31 - Drainage Swale 3 Cross Section, Spillway & Weir Details 607.7 KB
32 - Culvert Installation Details 635.9 KB
33 - Culvert Installation Details 716.5 KB
34 - Culvert Installation Details 1.2 MB
35 - Storm Drain System 1.0 MB
36 - Special Drainage Ditches 1.2 MB
37 - Bradley Rd. to 1358' East of Jensen Rd 1.7 MB
38 - Special Drainage Ditches 1.5 MB
39 - Manufactured Ditches & Modified Fill Slopes 1.7 MB
40 - Manufactured Ditches & Modified Fill Slopes 763.4 KB
41 - Temporary Erosion & Sediment Control 2.4 MB
42 - Temporary Erosion & Sediment Control 2.0 MB
43 - Guardrail Layout 1.0 MB
44 - Luminaire Layout 1.0 MB
45 - Luminaire Layout 1.3 MB
46 - Signing & Pavement Marking Plans 1.2 MB
47 - Signing & Pavement Marking Plans 1.2 MB
48 - Signing & Pavement Marking Plans 1.1 MB
49 - Traffic Control Plan - Phase 1 Overview 1.2 MB
50 - Traffic Control Plan - Phase 1 Detail 1.3 MB
51 - Traffic Control Plan - Phase 2 Overview 1.6 MB
52 - Traffic Control Plan - Phase 2 Detail 1.1 MB
53 - Traffic Control Plan - Phase 3 Overview 1.1 MB
54 - Traffic Control Plan - Phase 3 1.4 MB
55 - Traffic Control Plan - Phase 4 1.3 MB
56 - Traffic Control Plan 1.1 MB
57 - Traffic Control Plan 827.3 KB