Mead-Mt. Spokane Sewer Extension Package 2 Project No. 226C

This Public Works Project is for the construction of the Mead-Mt. Spokane (MMS) Sewer Extension Package 2 which proposes to install approximately 3,000 LF of ductile iron 6-inch dual sewer force mains (total 6,000 LF); approximately 3,300 LF of 8-inch gravity sewer main; approximately 4,300 LF of 10-inch gravity sewer main; 290 LF of 12-inch gravity sewer main; 31 sewer manholes; 42 side sewer stubs; 12,700 square yards of pavement removal and replacement; 8,850 square yards of gravel roadway; appurtenances; street and property restoration; and other related work. The project includes three trenchless undercrossings of State Highway 206.

Status

Bidding Closed

Prebid Date6/11/19 1:00 pm

Bid Date6/19/19 11:00 am

Company & Contacts

HDR Engineering, Inc.

Andrew Staples andrew.staples@hdrinc.com
(509) 343-8459  
Troy Gibbs troy.gibbs@hdrinc.com

Location

Mead, WA

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

06/11 – A PRE-BID CONFERENCE is scheduled to be held at 1:00 p.m. (local time), June 11, 2019, in Conference Room 2B, 4th Floor, Spokane County Public Works Building, 1026 West Broadway Avenue, Spokane, WA 99260. All interested bidders are encouraged to attend.

Project Estimate: $2,100,000.00 – $2,600,000.00