Saltese Flats Wetland Restoration Project - Phase 2

This Environmental Services project is for channel construction, pond excavation, elevated trail construction, and ditch filling in association with wetland restoration activities at the Saltese Flats project site, located southeast of Spokane Valley, WA. Phase 1 of the project was completed in early 2019.
  Addendum #1 (click to expand/collapse)
Download section as a Zip file free of charge
Name Size
02440-D-PH2-DG.dwg 207.5 MB
Addendum 1 1.3 MB