Public Jobs

Bids due in 3 days
1/27/21 11:00 am
CRP No. 2924 - Bigelow Gulch - Phase 3
Spokane County Engineering
Spokane County, WA
This contract provides for the improvement of Bigelow Gulch Road in Section 25, Township 26 N., Range 43 E. & in Section 30, Township 26 N., Range 44 E., W.M. by clearing and grubbing, roadway excavation, embankment compaction, plain steel culvert pipe, catch basins, storm sewer pipe, crushed surfacing top course, cement treated base spreading, mixing, processing and shaping, hot mix asphalt, topsoil, seeding, fertilizing and mulching, erosion control, guardrail, pavement marking, signing, illumination system, traffic control, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
12/2/20 11:00 am
CRP No. 3238 Separated Spokane River Centennial Trail at Carlson Road
Spokane County Engineering
Spokane County, WA
This contract provides for the improvement of the Centennial Trail located in Sections 6 and 7 in Township 26 N, Range 42 E.,W.M. by clearing and grubbing, roadway excavation, embankment compaction, culvert pipe, crushed surfacing top course, hot mix asphalt, silt fence, wattles, seeding and mulching, temporary traffic control, erosion control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
12/2/20 11:00 am
CRP No. 3239 Frideger Road Bridge No. 4902/CRP No. 3245 Frideger Road
Spokane County Engineering
Spokane County, WA
County Road Project No. 3239: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., followed by the removal of the existing bridge and the construction of a new structure over Little Spokane River. The new concrete bridge is a single span framed with precast-prestressed girders and is supported by steel pile at each end. Included are; bridge removal, structure excavation, structure surveying, steel piling, cone. CL 4000 for bridge, steel reinf. bar for bridge, superstructure, dust control on detour, beam guardrail, concrete barrier and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification. County Road Project No. 3245: The work provides for the improvements of Frideger Road Bridge No. 4902 located in Section 4, Township 29 N, Range 44 E.W.M., by removal of the existing roadway and widening with the construction of the new roadway. Project limits extend along Frideger Road with CRP-3245, adjoining CRP-3239 (bridge) at each end, starting 350 feet north of the bridge and ending 1/2 mile south of the bridge. Included are; clearing and grubbing, roadway excavation, embankment compaction, gravel borrow, beam guardrail, HMA, CSBC, dust control maintenance on the detour, and other work all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specification.
Bidding Closed
7/15/20 11:00 am
CRP 3244A - Geiger Blvd. - Soda Rd. to Grove Rd.
Spokane County Engineering
Spokane County, WA
This contract provides for the improvement of Geiger Blvd. from Soda Road to Grove Road in Sections 4 & 5 in Township 24 N, Range 42 E., and in Section 33 in Township 25 N, Range 42 E.W.M. by clearing and grubbing, removing concrete pavement, common borrow, embankment compaction, installing drywells, crushed surfacing top course, gravel borrow, HMA, topsoil, seeding, fertilizing and mulching, water pollution control, medium compost, cement concrete curb, cement concrete sidewalk, signing, pavement markings, illumination system, water main, sewer main, communications conduit and cable vault, temporary traffic control, and other work.
Bidding Closed
7/15/20 11:00 am
CRP 3240 - N Kentuck Trails Rd Bridge No. 4205 Scour Repair
Spokane County Engineering
Spokane County, WA
The work provides for the improvement of N Kentuck Trails Road Bridge No. 4205 located in Section 17, Township 22 N, Range 44 E.W.M., by stabilizing the Latah Creek slopes below the bridge, this will be accomplished by; placing rock armoring along the channel edges. Included are; work Access, Quarry Spalls, rock for erosion and scour protection, irrigations system, PSIPE, erosion control blanket, in water work isolation system and other work.
Bidding Closed
7/1/20 11:00 am
CRP 3230 - Pine Bluff Bridge No. 2609 Scour Repair
Spokane County Engineering
Spokane County, WA
This work provides for the improvement of the Pine Bluff Road Bridge No. 2609 located in Section 18 in Township 26 N. Range 42 E.W.M. by stabilizing the Coulee Creek slopes below the bridge by, this will be accomplished by; installing short cast-in-place concrete walls anchored to bedrock at the bases of the slopes, placing shotcrete on the slopes with soil/rock anchors, anchoring habitat boulders to bedrock at the base of the slopes and placing rip rap along the channel edges and walls. Included are; rock excavation, concrete Class 4000., steel reinforcement, epoxy-coated steel reinforcement shotcrete, rock anchors, streambed sediment and other work.
Bidding Closed
4/29/20 11:00 am
CRP 3232 - Hazard Road Drainage Improvements
Spokane County Engineering
Spokane County, WA
This contract provides for the improvement of Hazard Road Drainage Improvements in Section 26 in Township 27N, Range 42 E.W.M. by pavement demolition, excavation, culvert removal, arch pipe culverts, hot mix asphalt, ditch excavation and grading, riprap, plantings, erosion/water pollution control, temporary traffic control and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
5/6/20 11:00 am
CRP 3250 - Espanola Railroad Crossing Safety Improvement
Spokane County Engineering
Spokane County, WA
This contract provides for the improvement of Espanola Road at BNSF Railroad Crossing #40021 in Sections 02 & 03 in Township 24N, Range 40 E.W.M., by installing new type 31 guardrail with crashworthy terminal ends, grading of areas beyond shoulder to enhance traffic safety, update signs and striping, and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
4/1/20 11:00 am
CRP 3269 - Chattaroy Road CTB - US2 to Elk-Chattaroy Road/Hardesty Road
Spokane County Engineering
Spokane County, WA
This contract provides for the improvement of Chattaroy Road from US 2 to Elk Chattaroy Road/Hardesty Road intersection in Sections 26, 27, & 34 in Township 28 N, Range 43 E., W.M. by pulverizing existing pavement, providing Portland cement Type 2, cement spreading and mixing and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications.
Bidding Closed
2/12/20 11:00 am
County Road Project 3261 - Eden Pit (Re-Bid)
Spokane County Public Works Department
Spokane, WA
This contract provides for production and stockpiling crushed aggregates st Eden Pit No. 55-06 located in Section 6, Township 25 N., Range 45 E., W.M. and other work, all in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications